End-to-End Electrical Solutions from Supply to Commissioning

Indian Institute of Technology

Project Location: Tirupathi

Client

Kalpataru Power

Project Duration

June 2021 – February 2022

Project Scope

The project scope included the supply, installation, testing, and commissioning of C&S Make Bus Duct Systems, Lightning Busbar Trunking (BBT) for laboratory areas, Rising Main Systems, and End Feed Units. The work encompassed complete electrical system integration, ensuring reliable power distribution, adherence to quality standards, and successful commissioning for safe and efficient operation.

Citadel

Project Location: Hyderabad

Client

Brigade Enterprises Ltd

Project Duration

May 2024 – November 2024

Project Scope

The project scope included the supply, installation, testing, and commissioning of the C&S Make Bus Duct System, covering power distribution routes from the End Feed Units to the Main LT Panel (MLTP), DG Synchronization Panel, DG Systems, LT Kiosks, and Transformer connections. The works also included Rising Main Systems and associated electrical infrastructure, ensuring seamless power transfer, system reliability, and successful commissioning in accordance with project specifications and industry standards.

Twin Towers

Project Location: Yeshwanthpur Bangalore

Client

Brigade Enterprises Ltd.

Project Duration

April 2024 – February 2026

Project Scope

The project scope included the supply, installation, testing, and commissioning of the C&S Make Bus Duct System, Rising Main Systems, and End Feed Units. The works covered complete power distribution routes connecting the Main LT Panel (MLTP), DG Synchronization Panel, DG Systems, LT Kiosks, and Transformers, ensuring efficient power transmission, system integration, operational reliability, and successful commissioning in accordance with project requirements and industry standards.

Hanimadhoo International Airport

Project Location: Hanimadhoo Maldives

Client

Kalpataru Power

Project Duration

April 2025 – June 2025

Project Scope

The project scope included the supply, installation, testing, and commissioning of the C&S Make Bus Duct System, covering power distribution routes from the Main LT Panel (MLTP) to the DG Synchronization Panel and DG Systems. The work involved complete system integration, ensuring safe and reliable power transmission, compliance with project specifications, and successful commissioning for efficient electrical operations.

Brigade Square

Project Location: Trivandrum Kerala

Client

Brigade Enterprises Ltd.

Project Duration

September 2025 – February 2026

Project Scope

The project scope included the supply, installation, testing, and commissioning of the C&S Make Bus Duct System, Rising Main Systems, and End Feed Units. The works covered power distribution routes connecting the Main LT Panel (MLTP), DG Synchronization Panel, DG Systems, LT Kiosks, and Transformers, ensuring efficient power transfer, seamless system integration, and reliable electrical distribution. The project was executed in accordance with approved specifications, quality standards, and safety requirements, culminating in successful testing and commissioning.

Tech Boulevard

Project Location: Chennai

Client

Brigade Enterprises Ltd.

Project Duration

May 2026 - Ongoing

Project Scope

The project scope included the supply, installation, testing, and commissioning of the C&S Make Bus Duct System, Rising Main Systems, and End Feed Units. The work encompassed the execution of power distribution routes connecting the Main LT Panel (MLTP), DG Synchronization Panel, DG Systems, LT Kiosks, and Transformers. The project was carried out to ensure efficient and reliable power distribution, seamless integration of electrical systems, and successful commissioning in compliance with applicable quality, safety, and performance standards.